Energy subsidies in greenhouse horticulture 2026: EG and MEI in preparation
The transition towards more sustainable greenhouse horticulture is in full swing. For 2026, new schemes are expected under the Energy Efficiency Greenhouse Horticulture (EG) and the Market Introduction Energy Innovations (MEI) programmes. For growers looking to invest in energy savings or CO₂ reduction, this is the right moment to start preparing. At this moment, both schemes are not yet open. The EG subsidy is expected to open around the end of May. The MEI scheme is expected to follow within the same period.
Energie-Efficiency Greenhouse Horticulture (EG)
The EG subsidy focuses on improving energy efficiency in existing greenhouse operations. Investments that directly contribute to reducing energy consumption are eligible under this scheme. Examples include:
- Heat recovery systems
- Dehumidification systems
- Air handling units
- Heat pumps
- Combinations with aquifer thermal energy storage (ATES)
Solutions that recover and reuse heat align particularly well with the objectives of this scheme.
Important for ATES systems:
When applying for a system involving aquifer thermal energy storage, the required permit must already be granted at the time of application.
Market introduction energy innovations (MEI)
The MEI scheme focuses on innovative systems that contribute to reducing CO₂ emissions in greenhouse horticulture. It is particularly relevant for growers investing in advanced and future-oriented technologies.
Examples of eligible investments include:
- Innovative greenhouse concepts
- New energy systems
- Integrated sustainability solutions
- Applications that are not yet widely adopted in the market
What is happening in practice?
Although the schemes are not yet open, a successful application requires thorough preparation. Preparing energy-saving calculations, developing a well-founded proposal, and arranging permits and financing all take time and coordination. We have already supported multiple growers with previous subsidy applications and are currently actively preparing for the 2026 schemes. As a result, we are familiar with the regulations and how technical solutions align with subsidy requirements. In practice, we often see questions arise around the applicability of systems, making the right technical choices, and translating these into the required documentation. This is exactly where it is valuable to assess together what is and is not feasible.
Preperation makes the difference
The upcoming opening of these schemes offers concrete opportunities to accelerate investments in energy efficiency and climate optimisation. At the same time, these schemes are often oversubscribed, meaning that proper preparation can make the difference between approval and rejection. Are you currently working on an application or looking to prepare for the EG or MEI scheme? Our colleagues Carl, Steven en Jack are ready to answer your questions and provide tailored advice.
More information about these schemes can be found on the website of the Dutch Government.
If you have any questions?, please contact us
The team at SchermNed is ready to answer these for you